My Wind

2Kw wind turbine showing its furling capabilities in high wind conditions.

The development of our 2Kw Wind Turbine is complete. After two and a half years, 20+ proto-types, 1000's of theories.

We are currntly working through the final aspects of production and patents. 

 

If you have wind data from your location, (i.e. average wind speed, maximum wind speed) we can calculate how much power can be generated and estimate payback.

NEWS

10/06/20011

2Kw pre-productin wind turbine with lastest innovations installed at Napier Airport. Waiting for our production blades to complete development.

23/05/2011

Development of our 2Kw wind turbine is complete, with outstanding results.

The innovative furling system developed by Tweak Ltd allows the turbine to work in extreme conditions, however protects all aspects of the turbine for 15 years without maintanace.

11/05/2011

5 Kw Grid-tied System

Installed last week in Havelock North

Largest installation My Energy has completed to date